Tabakhmela–Teleti road paved with polymer modified bitumen from our own plant

Published:
Hairpin bend of the Tabakhmela road with a fresh asphalt layer, seen from a drone

Georgian Construction Group is carrying out the design and construction of the rehabilitation of the road from Tabakhmela village to the Marneuli highway, in the Mtatsminda district of Tbilisi. The section now being paved runs from Tabakhmela to Teleti.

On this project the whole asphalt chain is in our own hands, starting with the binder. The asphalt is made from polymer modified bitumen (PMB) that we produce ourselves, which makes it an important project for the company: it brings our PMB plant, our asphalt plant, our laboratory and our road crews together on one job.

Made in our own plants

The work runs in three steps, all inside the company:

  1. Our PMB plant mixes the SBS polymer LG 501S, made by LG Chem, into the bitumen and produces the polymer modified bitumen.
  2. Our asphalt plant uses that PMB to produce the asphalt mix.
  3. Our road crews lay and compact the mix on the Tabakhmela–Teleti section.

The polymer was imported by Chemicals, a fellow WT Group company, and is available for sale there. Details are on the LG 501S page at chemicals.ge.

Because one company controls every step, the binder and the mix can be checked at each stage, and our laboratory tests the materials before they go onto the road.

What polymer modified bitumen does

Ordinary bitumen softens in summer heat and turns brittle in frost. Adding a polymer makes the binder more elastic across that range. Asphalt made with PMB resists ruts under heavy trucks and cracks less in winter, which suits a hilly road with tight bends and steep grades like this one.

Where the road is

The Tabakhmela–Teleti section crosses the hills on the southern edge of Tbilisi and is part of the road that leads on to the Marneuli highway. The photographs and videos below show the new layer going down on the bends and the straight sections.

More about our asphalt is on the Asphalt page, and about this kind of work on the Road rehabilitation page.

The road from the air
Paving, seen from the road
Photographs

More news

All news →

Need asphalt, emulsion, or a road rebuilt?

Tell us the volume, the site and the date. We reply with pricing and lead time within one business day.

+995 32 255 08 56 Request a quote