Bakurtsikhe–Tsnori highway: Asphalt paving, photo 1

Bakurtsikhe–Tsnori highway

New two-lane asphalt concrete surface on 16.5 km of the Bakurtsikhe–Tsnori highway in Kakheti.

Location
Kakheti
Period
March–July 2024
Scope
Asphalt paving
Length
16.5 km

The Bakurtsikhe–Tsnori highway crosses the Alazani valley and links the Gurjaani and Signagi areas of Kakheti. In 2024 our crews resurfaced a 16.5 km stretch of it in asphalt concrete, across both lanes.

Paving started in March and the last section was finished in July, so the whole length was delivered in one construction season. On a job of this length the main task is to keep supply, laying and compaction moving at the same pace day after day, so that the surface comes out even from the first kilometre to the last.

The photographs and the video show the paving train at work and the finished carriageway.

Video
Photographs

Need asphalt, emulsion, or a road rebuilt?

Tell us the volume, the site and the date. We reply with pricing and lead time within one business day.

+995 32 255 08 56 Request a quote