Sagarejo bypass: Asphalt paving, photo 1

Sagarejo bypass

Asphalt surfacing of the bridges and connecting junctions on the new Sagarejo bypass in Kakheti.

Location
Kakheti
Period
September 2024 – January 2025
Scope
Asphalt paving

The Sagarejo bypass takes through traffic on the Kakheti highway around the town instead of through it. Our part of the project was the asphalt on the bridge decks along the bypass and on the junctions that tie the new road into the existing network.

Bridge decks and junctions are short sections, but they demand precise work at every joint, edge and transition. The bulk of the paving was done in September and October 2024, and the remaining sections were completed in January 2025.